top of page
Application Chart
Application | Nurture Growth | Water | Coverage Area | Frequency | Instructions |
---|---|---|---|---|---|
Vegetables | 1 tsp | 1 L | 1 row - 5 ft | 7-15 Days | Saturate leaves and soil area around the plant with mixture. Avoid applying during flowering stage to allow for natural pollination. resume application after legume has formed. |
Fruit Trees | 2 tsp | 1 L | 1 tree | 7-15 Days | Saturate leaves and soil area around the plant with mixture. Avoid applying during flowering stage to allow for natural pollination. resume application after legume has formed. |
Flower Garden or Beds | 1 tsp | 1 L | 1 row - 5 ft | 7-15 Days | Saturate leaves with mixture and pour remaining mixture directly on the soil. |
Hanging Flower Basket | 1 tsp | 1 L | 2 plants | 7-15 Days | Saturate leaves with mixture and pour remaining mixture directly on the soil. |
Orchids | 1 tsp | 1 L | 1 plant | Every 2 weeks | Soak Orchid plant in mixture for 15 minutes every 2 weeks |
House Plants | 1/2 tsp | 500 ml | 1 plant | 7-15 Days | Saturate leaves with mixture and pour remaining mixture directly on the soil. |
Lawn / Grass | 1 tsp | 1 L | 50 sqaure ft- 6 sqaure yards | 7-15 Days | Fill Nurture Growth bio-fertilizer in a chapin sprayer, set dial at #2, attach sprayer to the garden hose and apply mixture directly on grass. |
Soil Improvement | 2 tsp | 1 L | 22 sqaure ft- 2.5 sqaure yards | Spring and Fall | Saturate soil with mixture two weeks prior to plant. A fall application is also recommended at the end of the season to replenish nutrients in the soil. |
APPLICATION CHART
APPLICATION STEPS
Application Steps
02


MIX
Pour the appropriate amount of nurture growth bio-fertilizer and water -mentioned in the application chart- into the spray bottle and mix well.
03


SPRAY
Spray leaves generously with nurture growth solution and pour the rest of the solution into the soil.
SUGGESTED EQUIPMENT
Equipment
What It Can Be Applied on

HAND SPRAYER

WATER CAN

CHAPIN SPRAYER
HOSE ATTACHMENT




bottom of page